To achieve 30,000 megawatts of responsibly developed offshore wind power by 2035, and a vibrant local workforce building and operating the nation’s first offshore wind infrastructure.
To achieve 30,000 megawatts of responsibly developed offshore wind power by 2035, and a vibrant local workforce building and operating the nation’s first offshore wind infrastructure.